First, fixed platform bracket, granite surface plate has one or two adjustable foot fulcrum, according to the ground surface of the platform to fix bracket.
Second, install platform, use a forklift or crane to slowly raise or lift the platform from the box, place on the platform bracket gently.
Third, the stent has five or six fulcrum, they are the main fulcrum or auxiliary fulcrum.
Fourth, platform level debugging, with the digital level debugging, horizontal and vertical display value of the platform should be modulated within approximately digits.